The little used branchline track connecting the Tabacal sugar cane refinery to Pichanal, Salta. I only saw a few trains on this line, and sadly never got a photo of it in action. By 2015 flooding on the Rio Colorado would knock down a bridge on this line, perhaps forever rendering it out of commission. I dont know if this line was ever rebuilt after the bridge collapse, or if the one industry that used it was not enough to justify rebuilding it. |